Raw for the oceans

http://rawfortheoceans.g-star.com/

Advertisements

I <3 Trees!

Search the web, save the environment!

logo-b4e9a19d

I have recently added Ecosia as a plugin to google chrome. It is a search engine where every time you search via the site, you contribute to a tree being planted. Ecosia, like most search engines uses adverts to develop an income, however Ecosia donates 80% of that income to a tree planting project in Brazil.

Ecosia graphics are fun and upbeat and the best bit is it keeps track of how many trees you have helped to plant. I have apparently planted 18 trees since i started using Ecosia only a month ago.

Screen Shot 2014-08-19 at 13.13.35

Im not sure of the actual contribution using Ecosia has, or whether 18 trees have actually been planted thanks to yours truly. Nevertheless, I always like to support positive initiatives especially when its helping to replenish trees which are so vital to human survival and the biosphere.

Below is a link to a video explaining what Ecosia does and how.

http://www.ecosia.org/what

Its simple really.. search the web, save the environment!

Is building with glass sustainable?

I have recently joined London Sustainability Exchange (LSx), as a Project Volunteer and have been tasked to write a monthly ‘Sustainability in Architecture’ article to be included in the LSx news bulletin.

For my first article I chose the subject of glass and briefly assessed the rapid development of glass skyscrapers in the City of London. 

See my article below and view the LSx Bulletin via this link: http://charityemail.org.uk/CXK-2OWJM-B78OU91O20/cr.aspx

Sustainability and Architecture- Glass BuildingsPicture6

 

 

 

 

 

 

The recent development of iconic, entirely glazed skyscrapers changing the London sky line, including The Shard, The Cheese Grater and The Walkie Talkie, prompt the LSx to question how sustainable is building with glass?

Glass is a high energy, high cost material and as the construction sector develops towards transitioning to a more efficient design and building process we question is there still space for glazed buildings? The recent discussions led by architect Ken Shuttleworth and Arup engineers about whether the glass sky scraper is a thing of the past prompt the LSx to review the rapid development of glass skyscrapers in London, and wonder what the future holds for London’s landmarks.

In the 1920s Mies Van Der Rohes Glass sky scraper concept defied laws of materials and was a vision of a technological future. The Ideology of glass depicted then was of simplicity and ultimate modernism. Ninety years on we continue to heavily use glass, especially in iconic London landmarks. Despite glass being expensive and high in manufacturing energy it is still seen as modern and is vastly used in building today. In the current environmental context, the construction sector should be developing and using new innovative materials as an alternative to glass, that have a positive impact on our environment and society; materials that lay the foundation for a sustainable future.

Picture1Manufacturing glass is a high energy process and it requires extremely high temperatures. The energy used to produce glass for the entire facade of the Shard for example was on a tremendous scale. The shards white glazing means that the transparency of the building is a prominent feature however; the internal appearance appears messy and disorganised, drastically affecting its crystal shard like appearance. Furthermore, due to the particular white glazing used, the solar gains are vastly increased and require complex internal environment control.  However, The Shards glazing system is passive and is coated with a colourless solar-control coating, Ipasol made by Interpane and an integrated solar blind system claims to reduce solar gain by 95%.

Fundamentally, glass lets a lot of heat in and out. The preventive method to reduce solar gains and heat loss in glazed buildings is a tremendous feat of engineering and design. The Leadenhall building nicknamed The Cheesegrater, similar to The Shard, has a technical three tiered glazing system with integrated solar blinds. Despite being a very clever and innovative solution to overheating, from an Picture2environmental and economical viewpoint, it may have been better to design efficiency into the building rather than having to expend time, money and energy to mitigate the negative impacts on internal environment caused by glazed curtain walling. Architects are fixated on glazed facades; planners desire glazing and the public enjoy the iconic stylised designs. In order to achieve efficiency in building and develop toward a sustainable built environment glazing needs to be reduced.  

Despite the obvious environmental problems with building with glass, many more glass skyscrapers are planned to be completed in the City of London over the next five years. The reality is that iconic landmarks and quirky shapes dominate architectural design, prioritising aesthetics over efficiency and sustainability and it seems the vision for the future of the City of London is wholly ‘glass skyscrapers.’

 

 

Future glass sky scrapers in the City of London: 

20 Fenchurch Street- The Walkie TalkiePicture3

Completion:2014, overdue

 

 

 

 

 

52-54 Lime StrePicture4et- The Scalpel

Completion: 2017

 

 

 

 

 

 

 

 

 

Picture5

The Bishopsgate Tower- The Pinnacle

Completion: construction on hold since 2012

Burton Sailing Club Training Centre, A year since completion

It has been just over a year since the completion of Burton Sailing Club Training Centre.

The training centre has been a great success and has allowed for a tremendous increase in training at the club. The centre has been used nearly every day, providing varied training opportunities.

Im very happy to say that the off grid service systems have all been very successful even with the increase in use and the club has adapted very successfully to accommodate them.

 

photo 1 (1)

A year on i am still receiving compliments about the centre. My favourite one was hearing an anecdote about a child who had come off the water because he was cold and a bit fed up, often when this happens the child will not want to carry on sailing. However, after a few minutes break and time to warm up in the  training centre this child was all fired up, ready to go again. The instructor said that they felt the sole reason for this was the close proximity and positive atmosphere the training centre has. To me, that is the greatest achievement spatial design can have.

photo (3)

 

I am really happy with the way the building has settled so well in to its surroundings and how nature is thriving around it. There are rabbits and squirrels using the shelter underneath the building and it has even attracted a hornets nest. Im not sure hornets are a good thing when children are around but enhancing biodiversity has certainly been achieved!

 

 

I think the project has been a great success and i feel that it is really working well within its surroundings and for the sailing club.

 

Thanks to every one involved, I hope that centre continues to serve the club well for many years to come.

 

 

Opening of Burton Sailing club Training Centre

 

 

Great progress was made in the week of construction before the opening ceremony.

The solar panels went up and within a few hours were powering all the internal lighting, the access ramp was constructucted, the high level window frames and temporary glazing was fitted, the inside was finished and trimmed, and painting began on the window frames.

Unfortunately the build wasn’t completed for the opening, but the sun came and and it looked beautiful all the same.

399767_633245583369146_923142729_n

 

The Opening was a great success, the sun was shining and lots of people came to witness Tracy Edwards MBE cut the ribbon and pronounce the centre open.

309964_10151563345379322_349219557_n

Photo above- cutting the ribbon, from the left Mike Hampton- project manager, Dave Bell- Commodore BSC committee, Tracy Edwards MBE, Chloe Hampton- Designer, Keith Pallet- BSC training principle.

 

521598_10152758133875243_1372677835_n

 

It was a great honour to be part of the day and to be recognised for the efforts of the design and build, everyone was very complimentary and i am really happy with the progress of the build.

It is much better than i had imagined and i look forward to the centre being completed in the next few weeks.

521906_10152758132535243_822320704_n

 

Construction Week 8 and 8.2

Sorry for the late post for construction week 8,  I have been very busy with my final uni presentation. As it is now mid way through week 9, this post is a combination of last weeks visits and my site visit yesterday.

This photo was taken on friday when the glazing was being fitted. Its looking really nice, i love the reflection of the trees on this photo.

IMG_1429

The interior tongue and grove cladding has all bee fitted, it looks great. The polycarbonate window in the buffer wall has been fitted, and im very happy to say that is does bring enough light into the toilets and lobby, enough to see anyway.

The photos below were taken on Tuesday  as i had a wide angle lens and better photos of the interior. Since friday the laminate floor has been fitted.

IMG_1482

IMG_1489

IMG_1488

IMG_1486

IMG_1485

Over the past two days progress has been excellent. My visit yesterday has made me less worried about it finishing on time for saturdays opening. Theres now only 3 days work left to go.

IMG_1477

So far this week, the high level window frames have been fitted and look lovely. The toilets have been plumbed in. The roof tiles have all been fitted ready for the solar panels to go on today. A club member has kindly spent a lot of time doing some landscaping around the north and east sides of the build which has made a big difference and grounds the building into the site.

IMG_1466

IMG_1493

With the glazing and the roof on its all beginning to come together, and im very much looking forward to the opening on saturday.

Construction Week 7

IMG_1399

This week all the cladding has gone up and work has began on the inside. The insulation has started to be put in, all the window frames, door frames and doors have been put in, and the spaces are starting to look real.

IMG_1404

IMG_1406

IMG_1414

The training centre is beginning to come together, with two weeks until the opening i hope next weeks update will be longer. We expect the glazing to go in midweek, so im looking forward to my site visits this week.

Construction, Week 6

 

 

This weeks progress is noticeable.

The roof rafters were cut and positioned and the roof was sheeted with plywood. With the roof taking shape, you really start to get a feel of the training centre inside and out, i am pleased with how lovely and bright the interior is.

 

IMG_0112

 

The window frames have fitted and the glazing has been ordered. The view of the lake is framed beautifully by the east wall glazing. (photo below)

photo (19)

 

The vertical hit and miss cladding has started to go up, and is looking lovely.

IMG_0117

 

The electricians have finished the first fit and all the door furniture has been chosen and ordered.

This week there has been some design discussion about the disabled access ramp and the entrance stairs, the committee have approved the design change to make the access ramp larger and follow the shape of the building down the west wall. This change means that the veranda from the south side will be symmetrical. It also creates better disabled access and allows for a garden space to be created on the west side. The main entrance stair will also be on the south side with the east stair case being omitted due to height and cost reasons.

Progress this week has been impressive and i am very happy with it. From wednesday 3rd April i will be taking over the role of project manager and overseeing the build until completion, which i still hope will be in time for the opening on the 20th April.

Construction Week 5

At the end of week 5 there is now only 4 weeks left to the official opening. Tracy Edwards, MBE, Around the world yachts women has been confirmed to open the training centre on the 20th of April, the opening coincides with the RYA Onboard festival which is aimed to promote sailing to children.

Lets hope its finished in time!

This weeks progress has again been good.

The Perlin has been lifted in to place and the windows have been framed out ready for glass to be ordered. The Perlin was quite difficult to lift in to place and took 3 attempts with different techniques to finally position it.

photo (18)

The OSB on the outside has been sheeted with a breather membrane.

photo (17)

The internal particians have been partially clad and the electrician has started work with first fit of the cabling for the 240 volt system.

photo (16)

The first rafter has been measured and put in to place in preparation for the remaining to be positioned next week.

Construction Week 4

It was a really enjoyable visit today, as progress this week has been incredible.

This post has photo updates from each day this week to show the considerable progression.

Monday:

The the main external frames were positions and the subfloor fitted.

IMG_0062

IMG_0068

IMG_0066

Tuesday:

The floor insulation and floor board fitting began and the internal partition walls were positioned.

IMG_0069

IMG_0073

Wednesday:

The rest of the floor was completed, and all the internal frame works were fitted and secured and the door openings were created.

IMG_0081

Thursday:

The veranda was completed, and they began fixing the OSB cladding.

IMG_0085

Friday:

The rest of the OSB was put up.

The pillars were trimmed and the south wall plate positioned and the glulam purlin was partially lifted into place.

IMG_0092

As the building is being enclosed you really begin to get a feeling of the airy large interior, and the views that are framed by the chunky wooden frame are really looking nice.